instandart

Project Summary

A leading oil and gas company was tasked with developing a new gas processing plant. The engineering team relied heavily on off-the-shelf AutoCAD Plant 3D solutions for design, while the operations and procurement teams used SAP S/4HANA for asset and material management. Disjointed systems led to inefficiencies, duplicated data, and costly delays. To address this, the InStandart team implemented a CAD-SAP integration solution that ensured seamless data flow between engineering and enterprise systems.

Business Challenges

The project faced several critical challenges:

  • Data Silos: Engineering data (equipment specs, P&IDs, BoMs) resided in CAD/BIM tools, while procurement and maintenance data were managed in SAP.
  • Manual Entry & Errors: Engineering Bill of Materials (EBoM) had to be re-entered into SAP manually, leading to error rates of 15% and lost time.
  • Lack of Real-Time Visibility: Project managers lacked visibility into material availability and procurement status during design and construction phases.
  • Delayed Handover: Asset handover from engineering to operations was delayed by 6+ weeks due to formatting and compliance issues.

Solution

Our company developed and implemented a custom CAD/BIM–SAP integration platform that included:

  • Bi-directional Data Sync: Automatic extraction and synchronization of BoMs, equipment IDs, and asset metadata between AutoCAD Plant 3D and SAP S/4HANA.
  • Mapping Engine: A rules-based mapping engine to convert CAD elements into SAP-compliant material master data and equipment records.
  • Automated Validation: Built-in checks ensured that data met SAP formatting, naming, and categorization standards before transfer.
  • Live Dashboards: Real-time tracking of design progress, procurement status, and asset readiness across both systems.

Results

The integration delivered measurable improvements:

 

Metric Before Integration After Integration
BoM Data Entry Time ~4 hours per package < 15 minutes
Manual Data Errors ~15% < 2%
Engineering–Procurement Handover 6+ weeks 1 week
Asset Registration in SAP ~10 days/project Same-day registration
Total Engineering Hours Saved N/A ~1,200 hours/year

 

Additional benefits:

  • Improved collaboration between engineering and operations.
  • Reduced procurement delays by 25% due to faster material planning.
  • Seamless digital handover at commissioning phase.
  • Enhanced traceability for audits and compliance.

InStandart team implemented a CAD-SAP integration solution that ensured seamless data flow between engineering and enterprise systems.

InStandart team implemented a CAD-SAP integration solution that ensured seamless data flow between engineering and enterprise systems.

Subscription Answer
We use cookies to give you the best possible experience on our website. If you continue without changing your settings, we presume that you accept receiving all of the cookies on our site read more.
Accept