Here's What Our Tools Have Delivered on Real Projects

Three delivered plant projects. Each figure links to the case study behind it.

~15% → under 2%

BoM error rate after CAD-to-SAP integration, midstream gas processing plant

Integration of CAD/BIM with SAP case

10 days → 3-4 days

multi-discipline model review cycle, 8 disciplines including piping

3D model review tool case

4-6 months → 2-3 months

operator onboarding on an air separation unit

Operator training simulator case
icon
icon

Your Challenges in Oil & Gas Engineering

Capital projects bleed time and budget through four workflow gaps that spreadsheets and generic tools cannot close.

Manual BoM Transfer Between CAD and SAP

Engineering teams spend days extracting equipment specifications and piping materials from Plant 3D or AVEVA E3D models, formatting them into spreadsheets, and manually entering data into SAP for procurement and maintenance.

Clash Management in Spreadsheets

Multi-discipline process plant projects generate hundreds of clashes between piping, equipment, structures, electrical, and instrumentation – tracked manually in Excel with resolution taking days per conflict.

Lengthy Operator Training with Safety Risk

Plant operators require extensive hands-on training before working with critical process equipment – but training on live facilities creates safety risks, production disruption, and lengthy certification cycles.

Data Silos Between Engineering and Procurement

Engineering data lives in CAD systems, procurement operates in ERP, and project controls work in separate databases – no single source of truth, constant reconciliation, and delayed decisions from incomplete visibility.

Our Solutions for Oil & Gas Engineering

Purpose-built automation tools that address the specific workflow challenges of midstream and upstream process plant engineering.

Plant 3D/E3D → SAP Integration

Bi-directional synchronisation between AutoCAD Plant 3D, AVEVA E3D and SAP S/4HANA. Not a generic connector – a custom platform handling schema mismatches, project-specific naming conventions, SAP validation rules and change tracking. Delivered on Plant 3D: BoM entry ~4 hours → under 15 minutes per package, errors ~15% → under 2%.

CAD-ERP Integration

Automated Clash Detection & Coordination

Centralised model review replacing spreadsheet tracking with discipline ownership logic, version control and automated notification. 8-discipline facility: review cycle 10 days → 3-4 days.

Clash Detection & Model Review

Operator Training Simulators

Unity-based training environments built from your actual 3D models, P&IDs and PFDs – not generic plant templates. A real-time process model responds to operator actions, so opening a valve propagates consequences and alarms cascade as they would on site. ASU project: onboarding 4-6 months → 2-3 months, training cost per operator down 60%.

Operator Training Simulators

Automated Data Extraction & Reporting

Equipment lists, line lists, valve schedules and instrumentation data extracted from P&IDs and 3D models, regenerated on revision rather than rebuilt. Reporting that absorbed hours per project now runs in seconds.

CAD Data Export & Reporting
icon
icon

Why Generic Automation Breaks in Oil & Gas

Design Tools and Enterprise Systems Speak Different Languages

A "pipe" in Plant 3D is a geometric object with engineering properties. A "pipe" in SAP is a material master record with procurement attributes. Mapping between them requires project-specific rules – your naming conventions, your material classification, your compliance requirements. No generic connector handles this.

Multi-Discipline Coordination Goes Beyond Clash Detection

Navisworks detects clashes. Nobody manages their resolution out of the box – assigning the right discipline based on scope splits, tracking version states across parallel model updates, capturing decision trails for audit.

Specialist Platforms Need Specialist Expertise

AVEVA PML, Smart 3D tools, Plant 3D SDK – these are niche APIs with minimal public documentation. AI code generation doesn't work on them. Your internal team is too busy with project delivery. We develop natively in PML, PML.NET, AVEVA E3D API, Smart 3D tools, and AutoCAD Plant 3D SDK – and we understand the engineering context behind the code.

Process Simulation Requires Plant-Specific Fidelity

Generic operator training simulators use library process models from a different facility type. Your ASU, your compression train, your cryogenic system has a specific thermodynamic configuration that determines real plant behaviour. Training on the wrong dynamics creates false confidence.

Compliance Demands Traceability, Not Just Data Transfer

Every data movement between engineering and enterprise systems is a potential audit finding. Our integration pipelines log every transfer with timestamps, source records, and validation results – bi-directionally. This isn't a compliance add-on. It's a structural requirement for engineering-grade automation in O&G.

Case Studies

Real projects where our automation delivered measurable improvements for midstream and upstream operators and EPC contractors.

Integration of CAD/BIM with SAP for a Midstream Gas Processing Plant

Engineering worked in Plant 3D while procurement ran on SAP, with no automated connection between them. Every Engineering BoM thousands of line items per package was re-entered by hand at roughly 4 hours and a ~15% error rate. Project managers had no view of material availability during design, and asset handover to operations ran consistently 6+ weeks late.

BoM entry ~4 hours → under 15 minutes per package. Errors ~15% → under 2%. Handover 6+ weeks → 1 week. Asset registration ~10 days → same day. Roughly $120,000 in annual engineering labour savings about 1,200 hours at a $100/hour rate.

More Information About Case
Integration of CAD/BIM with SAP for a Midstream Gas Processing Plant

3D Model Review Tool for Multi-Disciplinary Clash Management on a Gas Processing Facility

Eight engineering disciplines. Hundreds of clashes. All tracked in Excel with no version control. Coordination meetings wasted time arguing about which model was current.

We deployed an automated platform with version control, duplicate filtering, assignment workflows, and live dashboards. The result: coordinators could stop chasing spreadsheets and start solving actual design problems.

The review cycle went from 10 days to 3–4 days. Audit preparation became a report rather than a reconstruction, and coordinators stopped chasing spreadsheets.

View More Details
3D Model Review Tool for Multi-Disciplinary Clash Management on a Gas Processing Facility

Operator Training Simulator for an Air Separation Unit Built from Detailed Design

Traditional training took 4-6 months with safety incidents during hands-on practice. Emergency scenarios couldn’t be practiced on live equipment – too dangerous. New operators felt unprepared when emergencies actually occurred.

We built a Unity-based 3D training simulator from their P&IDs and process models. Operators practice normal operations, startup/shutdown procedures, and emergency responses in a safe virtual environment – making mistakes and learning without real-world consequences.

Measured against the same training workflows before deployment: onboarding from 4–6 months to 2–3 months, training cost per operator down 60%, procedure retention from around 60% to over 90%, incidents during onboarding down 80%, emergency response preparedness up 70%.

See More Details
Operator Training Simulator for an Air Separation Unit Built from Detailed Design

Technologies We Use for Oil & Gas Engineering

AutoCAD Plant 3D logo AutoCAD Plant 3D
AVEVA E3D and AVEVA Diagrams AVEVA E3D
Intergraph Smart 3D and Intergraph Instrumentation Intergraph Smart 3D
SAP S/4HANA logo SAP S/4HANA
CAESAR II Pipe Stress Analysis logo CAESAR II
Aspen tech HYSYS logo Aspen HYSYS

Frequently Asked Questions

Ask Your Question

Can you integrate AVEVA E3D with SAP?

Yes. Our DesignBridge platform supports bi-directional integration between AVEVA E3D and SAP S/4HANA, handling the schema mismatches, project-specific naming conventions, and SAP validation rules that make generic connectors fail. The same architecture we deployed for AutoCAD Plant 3D–SAP integration on a midstream gas processing plant – where it eliminated 15% BoM error rates and saved 1,200+ engineering hours per year – is applicable to E3D environments.

What oil & gas CAD platforms do you support?

We work with AutoCAD Plant 3D, AVEVA E3D (Everything3D), and Intergraph Smart 3D – the three dominant platforms in midstream and upstream process plant engineering. Our integration, clash detection, and data extraction tools are built on the APIs and data structures specific to each platform, not on generic file-based workflows.

How do operator training simulators reduce safety incidents?

Our OTS eliminates the need for operators to learn on live equipment. Built from your actual 3D model and P&IDs, the simulator lets trainees practice standard procedures, emergency shutdowns, and fault scenarios – cryogenic leaks, compressor surge, power loss – with zero risk. On an ASU project, this approach reduced onboarding safety incidents by 80% and achieved 90% retention of operational procedures, because operators arrived at the live plant having already practiced every critical scenario multiple times.

What’s the ROI on CAD-SAP integration for oil & gas?

On a midstream gas processing plant, the integration saved roughly 1,200 engineering hours a year about $120,000 at a $100/hour rate by cutting BoM data entry from around 4 hours to under 15 minutes per package. Beyond labour: error rates fell from about 15% to under 2%, engineering-to-procurement handover went from 6+ weeks to 1 week, and asset registration in SAP from about 10 days to same day. For facilities with thousands of line items per package, payback is measured in months.

Our stack isn’t Plant 3D. Does that change things?

The validation, mapping and synchronisation architecture is platform-independent; what changes is the extraction layer PML and the E3D data model, or the Smart 3D API, instead of the Plant 3D SDK. We scope that layer explicitly rather than assuming it carries over. Our delivered SAP integration was built on Plant 3D, and we’d rather say that than imply a delivery we haven’t made.

Running Plant 3D or AVEVA E3D?

Let's map your workflow and find the leaks – where time, accuracy, and capacity are being lost. Book a 30-minute workflow assessment where we'll walk through how your engineering data currently flows – from Plant 3D or E3D design through BoM generation, procurement, clash coordination, and asset handover.

38 Middlehill Road,